May 27, 2022     Throttle quadrant mounting - (5 hours)       Category: Fuselage
Mounting of throttle quadrants. Modifying former mounting tab because throttle cable would penetrate the middle of the tab. Quadrants disassembled to fit between fabric on the outside and outer extremity of steel cage on the inside. One assembly bolt must be exchanged for a countersink #10 screw . Additional stringer material mounted below quadrants


 